Primer - Anchoring Framing to Foundation

September 11, 2016
Hey folks, thanks so much for continuing to visit this blog, even though my activities have been 100% occupied with building theEnclosure.ca and the last article I posted here was all the way back in February. As promised, I intend to post more technical themed articles to this blog and use the project journal on my build site for my day to day thoughts and tribulations on building an energy efficient home.

So, it is time for an article that provides a primer into Anchor Bolts. In the days of old, a concrete placing crew would just embed a 1/2" anchor every 4ft or so and call it a day.


Most dwellings had either small cripple walls placed above the foundation wall or had the floor joist assembly sitting right on top of the sill plate. Both of these were able to easily accommodate the location of the anchor bolt with little effort.


Modern construction has changed a great deal in this regard. In areas of high seismic activity, the location of anchor bolts is critical to meet either the code prescriptive path to seismic rigidity, or an engineered path. For us @ theEnclosure.ca, we were forced by the Municipality to upgrade from the Building Code prescriptive path and instead use the prescriptive path laid out in Canadian Wood Council's Engineering Guide For Wood Frame Construction Part C.


In Part C, the requirements for anchor bolts for my region (Lower Mainland BC, Canada) are laid out as follows:

- There must be two bolts minimum per braced wall (seismic) panel

- The bolts must be installed no more than 1.64 ft from each end of a foundation wall

- Bolts must be installed every 7'10"

- 1/2" embedded 4" into the concrete


It is interesting, in contrast, the BC Building Code required 1/2" anchor bolts spaced no more than 5'6" apart (7'10" was allowed but only for 5/8" bolts).

So now, it is critical that prior to your concrete crew coming, all anchor bolt locations are marked out on the form work to comply with the newer seismic regulations. It is also important that the setback from the foundation wall face is identified to ensure that the anchor bolt will miss objects like rimboards (engineered wood) or rim joists (real wood).


For our construction, we had an added level of difficulty surrounding the placement of these bolts. Our design includes a dropped floor assembly that is flush with outside grade in order to meet the requirements of SAFERHome Society. But code still requires that the foundation project 6" above grade (BCBC 9.15.4.6) which results in a concrete foundation stub projecting above the floor surface.

Building code requires the foundation to extend 6" above grade to prevent wood components from rotting.  On a floor assembly that is flush with grade (dropped), this results in a concrete stub extending above the floor.


As my wall framing was then mounted directly to the foundation, it was critical that in addition to meeting the seismic requirements, I also had to ensure that they were placed to miss my wall stud framing. I was about 85% successful in this endeavour. The rest had to be cut off and replaced with drill-in anchors, which my inspector stated would accept for a limited qty.


SO, you have all your anchor bolts embedded at the right locations, lets add the washer and nut and call it a day - right? From a code perspective, you would be right. But there is a best practice when it comes to anchor bolts. I have to thank one of my Home Inspection client's Nikolas for this information.


Turns out that the washer makes a perfect wedge to split the plate apart during an earthquake as the bolt bends under the shear loads exerted by a quake. Who knew??? I reviewed the article that Nikolas sent and written by Howard Cook titled "The importance of Plate Washers"


Howard retrieved the following graph from the Los Angeles Building and Safety department (a group that knows a little bit about earth quakes don't you think!)


You will see that at every point along the graph, that the wall using a plate washer deflected less for a given force when compared to the round cut washer. By introducing a 3" x 3" plate, you are able to better prevent the bolt from bending under shear and preventing the splitting of the sill plate. The mentioned article includes a sketch by Nels Roselund that shows the reactions involved.


Based on this information, we elected to use the 3"x3" plates on The Enclosure but did run into problems on many of the bolt locations. Unless the anchor bolt was dead centre in the 2x4 sill plate, there was not enough room between the sheathing and the bolt or the inside face of the stud and the bolt, to place the plate. SO we used the plates for as many of the bolts as possible and then just the standard washers for the rest.

Just enough room for plate between bolt and sheathing

This bolt was placed too far outboard to slide the plate on.

Howard has also published an article titled Bolting: Attachment Of The Mudsill To The Foundation for those interested in additional reading. Nikolas also forwarded the article QuakeCheck: When the big one comes, will your home be "Safe enough to stay?" which made for a great read to further brush up on this subject and how to address it.


If you have an older home, it may be time to upgrade your anchorage. Is it not worth a few hundred dollars and one day of your weekend to make your family as safe as possible in a seismic event?


Thanks for visiting!
Top ↑

Mould – The Black Scourge (And how to eradicate it)

February 26, 2016
As most of those that frequent this blog or my build website know, I am already 2 years into the process of building a house for myself and my wife, by myself, and still have a LONG way yet to go.
With the famous proverb "You can have it Fast, Cheap, and Good - Pick Any Two", I have elected to build cheap and good (actually very good), and therefore, I am far from fast.  Further delays with broken shoulders and bulged discs in lower back, and progress at times has literally been brought to a crawl!  This resulted in a partial structure being exposed to the winter elements because I was unable to proceed fast enough to allow framing and roof completion during summer of 2015.

Now, I have taken great pains to keep this partial structure dry during construction, first with a large overhead tarp (Big Ass Tarp - B.A.T.), and then with smaller tarps closer to the floor deck when the B.A.T. was shredded in a wind storm in Dec 2014.  And generally I have been successful in keeping bulk rain water off the structure.  So imagine my horror last December when I finally installed some construction lighting in the now very dark basement, only to turn the lights on and find I had mould and staining fungi all over my engineered beams.  Quite frankly, I was devastated.  It also did not help that I am allergic to the stuff and started getting chest issues from working in the basement.


Left - Big Ass Tarp (B.A.T.) measured 60' wide x 80' Long    Right - Current Configuration of Smaller Tarps have kept all bulk water off structure.

So what went wrong?  If it did not get wet from rain, why was there an issue?


Well, in all of my careful attention to what was falling from above, I did not focus ANY attention to what was rising from below.

You see, I basically have built my house above a temporary swimming pool. Granted a very shallow swimming pool, but a pool just the same.  The whole structure is built over a crushed gravel base.  Even the footings have a minimum of 6"-8" of consolidated 3/4" crushed rock beneath.  This will provide the drainage plane under the yet to be poured floor slab, and there lies the problem.  There is no concrete floor slab or sub slab poly keeping the moisture within the gravel drainage at bay.  There is a HUGE surface area (approx 1750 sq. ft.) of water that may only be 1/4" deep at times, but that is still a lot of moisture that can evaporate off and create a very high humidity environment in the basement.  Add to this all of the construction moisture present in the still curing foundation walls, the recently poured suspended garage slab, and from the storage of various salvaged wood I used for scaffolding (and therefore exposed to rain and saturated) that was stored in the basement (ironically to dry out).  When I started measuring the humidity after discovering the problem, I was in the very high 80's for RH% and clearly had been so for several months.


Now, realize at the time, that the basement was still very wide open from a ventilation stand point.  There was a 4'x8' door opening in the side of the foundation to service the basement exterior walk up stairs, and there is the stair opening in the floor assembly that will service the interior stairs to the basement.  So air movement was not an issue, but the humidity was still too high.  Add to this the crazy dew-points we have in North Vancouver, and the opportunity for condensation to form on the structure was high.
As an example, photo at right shows ice forming on UNDER side of tarp due to tarp surface cooling below dew-point of ambient exterior air due to night sky radiation.  This was a fully ventilated area.  As you can see in the background, there is no walls.

Do you still believe ventilation is the answer for attic mould???


The next factor is that any engineered wood (like my PSL beams) is more susceptible to wetting.  The glues in these beams readily absorb moisture, as does the heart wood often utilized in the manufacture of engineered wood.  The result was that my beams had reached a fibre saturation moisture content (roughly 32% WM), which is the point needed to inoculate wood for fungi growth. After inoculation, the moisture content only needs to be above 19% for the fungi to continue growing.

So, in the end, it was the humidity from below that bit me, not the moisture falling from the sky above.  So now what?  What are the possible steps to remediate?

Well, I can tell you that in a lot of construction, it would just be covered over with drywall and ignored.  And by rights the structure should be below 19% WM before covering up with drywall so technically the mould would be dormant by then.  But what happens if the humidity in the home is too high for extended periods of time (say there is a bathroom with a shower nearby, or the owner likes indoor plants).  A relative indoor humidity above 70%, for an extended period of time, could lead to the wood wetting up past 19% again.  With my allergies, leaving it was not a good idea, so I set out to remediate it.

I talked with some individuals in the building envelope industry including a group doing an attic mould remediation study.  I also had studied this subject intensively in the past, because as a previously practicing home inspector, I always struggled with the right information and advise to provide clients, when the inspected home had a mouldy attic.  I knew that you had two tasks: First remove the evidence of the fungi contamination, then kill or render dormant the actual fungi spore.  If you only killed off the spore, you would still be left with the staining which would present as a defect to the consumer, but more importantly would not allow you to identify if any new fungi growth occurred in the future, as it would be too hard to spot new staining overtop of the old staining.

The group doing the study recommended a cleaning protocol utilizing one of the following three options:

1) Scrub surface with soap and water
2) Scrub Surface with a mild bleach solution
3) Spray Surface with Concrobium Mold Control (Commercial product - not the stuff you buy in Big Box Stores)

This cleaning protocol was to 'reset' the appearance of the infected product before treating and preventing future fungi growth.

Well, I can report that all three strategies were woefully inadequate on the rough and porous surface of an engineered beam.  1 & 2 may work on a surface like painted drywall or even a real wood surface like a 2x4, but on the engineered wood they were generally ineffective. Photo at left shows a beam after being treated with both the soap & water solution and then a bleach solution.  While the cleaning removed some staining intensity, it is still clearly visible.



I then tried option 3 and sprayed the surface of all beams with the Concrobium Mold Control, which is supposed to have some stain removing capabilities.  In my tests, it was even less effective as the soap and water or bleach solutions at removing the staining.







Photo at right represents the results 48 hours after treatment.  Unfortunately, I did not have a clear 'before' photo but this beam started with substantially less staining than say the beam in the above photos. The staining present after treatment was very similar to the start point prior to treatment.

With all three cleaning protocols a bust, I regrouped and brought out the big gun.  Concrobium also make a product called Mold Stain Remover.  This is a mixture of Sodium carbonate peroxyhydrate (basically granular hydrogen peroxide - used for instance in non bleach cleaners like OxiClean) and Propylene Glycol Diacetate (a solvent, presumably to help allow the cleaner to penetrate past the surface of the material to be cleaned).  Together they pack a punch but generally break down into biodegradable by-products and personal protective gear required for application is minimal.  Rubber gloves are a good idea as it can irritate skin and some form of eye protection is recommended as it does burn if you get any in your eyes.  It also gives off a strong acid like odor when mixed, but this dissipates in less than 24 hours after spraying.

I have now sprayed the product twice in different areas of the basement.  The first time I mixed it with the hottest water out of the tap at our rental suite and all of the crystals generally dissolved.  The second time I specifically measured the temp and brought the starting point down to 100F (max recommended).  But by the time I sprayed, it had cooled to 70F and I found a lot of the crystals on the second application had not dissolved and were still in bottom of mix bucket. So I would be inclined to start with water slightly above 100F, so that after mixing and by the time you load the sprayer you are within the required 80-100F application range.  Also while writing this entry, I re-reviewed the application instructions and now realize you are supposed to add the crystals (part 1) to the warm water FIRST and stir to dissolve BEFORE adding part 2.  I added both together and then stirred on the second application (do not remember what I did on the first), this may have effected the ability for the crystals to fully dissolve in the mixture.  Regardless, the results were extremely impressive!




  
Photos on left are before treatment with the Mould Stain Remover but remember after treatment with the Mold Control product.  The right photos are after 1 treatment of the Mould Stain Remover. As you can see, the stains are gone on a majority of the surfaces, but there was still locations where the staining was present like the following images.

 What I suspect happened at these locations is that they did not get wet enough for long enough when sprayed.  The instructions state that the surface is to stay saturated for 60 mins.  SO I mixed up a second batch a few weeks later and have now all but eradicated the stains As is shown in the following photos.


 
Photos at left prior to treatment with the Mould Stain Remover but after previous treatment with Mold Control.  This elimination of the mould staining generally happened in the first 60 minutes after spraying.




But the best example is this spare beam I have sitting on my garage floor.  Photo on left was after using 3% H2O2 which although dimmed stains did not remove them.  Photo on right shows the complete removal of stains with the Concrobium Mould Stain Remover.

So there you have it.  A easy, fast, and relatively affordable method to remove mould stains from engineered wood.  I will now spray all the beams with the Mold Control product to kill or make inert any remaining mould spores and prevent future growth.  I will leave the test beam above untreated so that I can determine how quickly the mould would come back if left untreated.  I have to say, it was a HUGE physiological pick-me-up to walk into the basement after the second treatment and not be able to see any stains remaining.  Now I can count on a healthy basement with no future issues.
Top ↑

Zero Waste

November 22, 2015
A walk down Bea Johnson's Path to Sustainable Living.

Life Without A Trashcan: A Look Inside the Zero Waste Home

One year of smart and sustainable living had some pretty, uh, jarring effects.

Bea has managed to reduce her family's garbage YEARLY output to the mason jar.  She does this by generally buying in bulk and using her own glass or cloth containers.

This is truly impressive and a example to try and follow.  While I have reduced the waste, that goes to landfills, in my home to about 2-3 garbage bags a year, I do end up with a LOT of packaging that must be recycled each week.  I will buy her book and try to start incorporating some of her ideas in my lifestyle going forward.
Top ↑

We need new testing procedures for insulation to show the full story.

October 30, 2015
Hey folks, Sorry it has been so long since last posting. Been busy on the house construction. I do keep a project journal and update it weekly at theEnclosure or you can click on the updates listed on the right side of this blog.

I should have a technical update for you soon where I review all of the products/methods I used in constructing my basement.  In the mean time, I wanted to expose my readers to an excellent article written by Rockford Boyer of Roxul.  In it, he identifies the risks of using a set insulation R-Value in your modelling as with many products, the resistance to heat loss changes depending on temperature.

 The Theory of R-value Relativity: The impact of thermal conductivity on building enclosure durability

 By Rockford Boyer, B. Arch. Sc., BSSOWhen designers are deciding which insulation products to specify for a given project, two questions come to mind: ‘What is the R-value?’ and ‘What is the permeance?’



 One of the things that caught my eye was the danger faced, when modelling in WUFI, of getting erroneous results.   I have extracted two of the tables and shown below.  As you can see, there is a huge difference between the reported results.  Fig 1 is using the material  from the WUFI database and Fig 2 is re-running the material with a material properties entered manually and based on actual testing.  The risk if you are not aware of these issues, is designing an assembly that in real life will act nothing like your model.  If you are lucky it will be better than the model but in most cases it will mean you have a higher risk in your assembly than designed for.  A risk that may overwhelm the assemblies ability to recover.

Fig. 1 Extrapolated R-Value based on WUFI material database.

Fig.2 Extrapolated R-Value based on actual lab testing

Top ↑

Insulating a Durisol ICF Foundation

August 31, 2015
Hey folks, sorry for the time span since the last post.  I have been concentrating on keeping my building journal up to date.

As I recently have had some free time due to yet another set of medical setbacks, I recently finished editing and uploading a video showing my process of adhering the Roxul ComfortBoardIS mineral wool insulation to my ICF foundation.


The Soprema Colphene Torch'N Stick membrane would typically be used on a site formed concrete foundation, but because I am using a ICF product from Durisol (made from mineralized wood fibre and cement slurry), I too could use this torch on membrane (a process that would destroy conventional EPS foam ICF forms).  The 'tacking' of the insulation to the membrane is only a light mechanical bond and is only suitable for a temporary support of the insulation (or dimple board and other protection sheets) until the backfill takes place.  You would not be able to use the method for a permanent attachment in an above grade assembly.

Once the insulation was attached, I then fastened dimple sheet to the insulation, installed a granular drainage plain, geotextile, and then compacted backfill.  You can read about these steps on my "coming out of the hole" journal entry.

The overall foundation assembly will have multiple layers of safety and will be very durable, but the installation is costly and very time consuming. I can understand why many of these steps are not incorporated into most residential construction. But then, most residential below grade basements are wet to some degree. As my friend Murray Frank often says "You never hear a comment 'It smells as good as a basement'".

Thanks for visiting folks. I will hopefully post a review of all the products I have used to create my foundation walls within the next few weeks. A majority of the products get a thumbs up from a technical standpoint, but one in particular is a two thumbs down with extreme prejudice.  I encourage you to subscribe if you want to be notified of when this review is posted.
Top ↑

SENWiEco concludes testing of DURISOL ICF Block

June 3, 2015
When choosing a foundation your options are typically a site formed and poured concrete wall or some form of insulated concrete form (ICF) wall.  Early on in the process I gravitated to an ICF wall because it would eliminate the need to hire forming crews and rent and fabricate forms.

When looking at ICF, the traditional product is made from some form of EPS foam which has a very high embodied energy, lots of off-gassing, and is made from non-renewable components. The foam industry (EPS and XPS) will try to 'green-wash' this by stating the foam, as an insulation, reduces heat loss and reduces carbon output over the lifespan of the dwelling.  Yes this is true for ANY insulation, so choosing an insulation with a starting lower embodied energy will put you that much further ahead on your reduction goals. So again, early in the process I looked for a product that on the surface was friendlier to the planet.

One of the benefits of all ICF walls is that they typically require a smaller concrete core than a standard foundation.  The code allows for a 5.5" core on ICF walls where a standard site formed wall generally start at 8".  The reason for this escapes me because the ICF product itself is not considered structural so why would all walls not be allowed to be only 5.5" regardless of forming method.  If someone knows the answer to this please post a comment.  The smaller core of the ICF significantly reduces the concrete needed and therefore the cost and embodied energy of the overall wall.

One of the other downsides to a typical ICF forming material (foam), is that you end up with too much insulation on the inboard face of the core.  This decouples the core from the interior environment and can lead to condensation in some isolated cases, but more importantly it limits the walls ability to be a moderating force to the homes inside environment. An exposed concrete wall can buffer the temperatures by acting as a thermal mass.

The further downside to foam style ICF blocks is that just about everyone loves them from rats to ants.  They burrow and nest in the product creating holes in your thermal blanket.  They are also quite fragile and can be easily damaged during construction and require significant blocking during pouring to prevent blow-out.

My quest for the perfect block led me to the Durisol product.  It is made with virgin but scrap wood (manufacturing waste and tree tops).  This wood is chipped and then through a patented process, the organics are removed to create a mineralized wood fibre (think petrified wood).  This is then added to a cement slurry and formed into the ICF block.  This process and product would help meet my goals to dramatically reduce the embodied energy of the foundation.

There is another similar product made by Faswall, but my research indicated that this product utilized non-virgin wood sources like used pallets and had a lot more dimensional tolerance issues with the block itself.  I also was informed that Faswall was initially going to be a licensee of Durisol but ended up swiping the formulation and heading out n their own.  This did not sound like the right fit for me so I focused on Durisol even though it meant I would have to freight them from back east.

Once I decided to seriously consider Durisol, I then wanted to ensure it was suitable for the task. My immediate concern was that the blocks would rot.  But the product has been used for decades as sound abatement walls on highways (where some of the wall is always buried) and I received a letter from the Ontario Ministry of Transport advising that they have never had to repair a wall due to decay (just traffic accident damage).

My next concern was how would this wall act from the point of view of air and moisture movement.  It was made clear from the beginning, that I would need a independent air barrier as this product was air permeable (it has webs that penetrate through the concrete core so the core is not continuous).   So this was a negative against the product when compared to foam, but as I wanted a bullet proof building enclosure, I had always planned on an robust WRB (water resistant barrier) on the exterior of the foundation.  I think the idea of 'damp-proofing' a foundation wall in a rain forest climate is ludicrous and had always planned on Water Proofing my wall.  And a waterproof membrane is almost always also an air barrier.

My next concern was how the blocks would act if subjected to regular wetting.  The manufacturer claimed the product was unable to support capillary action and had some university testing to support.  But I was not satisfied and so set out to torture test the product over 16 months.  I started the experiment in Jan of 2013 (Begin experiment).  At the eight month mark I posted the status) Status at 8 months) and then altered the block to also contain the concrete core.  The experiment concluded on June 1, 2014.




All off my testing supported the manufactures claims.  This was a free draining assembly that did not support moisture movement from the outboard to inboard face.   I will also be preventing moisture movement through the footings via a FastFoot mebrane and also using a touch-on or self-adhered AB/WRB mebrane on the outside face of the foundation and so will have a very durable and forgiving assembly.  I now felt confident using this product on my project and have now received the product on site.  Once the excavation is complete, I will post some videos on the installation of the product (visit my project journal for the tribulations in getting these goods to site).

As I have time (may be at end of construction, I will also try to post some cost comparisons between the various options and the embodied energy numbers).

Thanks for visiting.
Top ↑

Air Leakage of Old House - Does it matter?

May 30, 2015
*** Update - Upon further reflection of this topic, I do feel there is one additional reason to perform energy upgrades and discuss it in my project journal http://www.theenclosure.ca/windy-house ***
 
This blog entry will analyze the air leakage of a 1954 house and relate that to the energy use and durability of the house.

Before I started tearing down my 1954 single storey 1500 sq ft bungalow to make way for theEnclosure.ca, I decided to have the house tested for air leakage by Michael and Deborah from H&H small home solutions inc (hhsss at shaw dot ca).  H&H typically perform leakage testing to determine the EnerGuide rating for new construction, so this was going to be a new experience for them (and their blower door).

They came by in late March of 2014 after I had moved out but before I had completely emptied the house and before any deconstruction had been performed. The house was prepped by sealing the wood burning fireplace insert, range hood, and the through-wall mailbox before setting up the blower door.

We first ran the door in a B configuration and were unable to get up to the final test pressure of -50 Pa. But even in this configuration we got some scary results.  I had not really made any great attempts to air seal this house over the years.  There was weather stripping on 1 of the 3 doors, and the cedar siding had each coarse sealed to the next and the siding sealed to most of the window and door frames. But no attempts had been made to seal the interior interface with the attic plane and 1 of the doors had a cat door in it and the main door itself had very large gaps around it.

Prior to starting the test I had predicted an air leakage around 8-10 ACH (Air Changes per hour) @ -50 Pa, but early in the test we could tell it was going to be well above this. Deborah could tell just from the sound the fan was making (there previous worst house they tested was 11 ACH @ -50 Pa which was scary as it was new construction).

Right off the bat we reached 28 air exchanges at only -15 Pa!  To give you an idea, 15 Pa relates to a wind speed of only 11 MPH.  In the fall, I regularly recorded winds speeds on the property at this speed or higher so during those events all of that CONDITIONED air in the house was potentially changing over 28 times every hour. That is a lot of extra load on the heating plant and also explained the drafts my wife typically was feeling.


Over the next hour or so we tested at various configurations until we ran the fan at full open configuration (no restrictor plates). Only then could we get enough air volume to allow us to reach the target test pressure of -50 Pa.  AT the full test pressure we recorded an air leakage of 21.74 ACH -50Pa.

Now wait, some of you may have noticed that that is less air leakage than what we observed at only -15 Pa.  How is this possible you say?

Well, it is actually quite common.  As more and more negative pressure is placed on a dwelling, the two surfaces on each side of an air path (leak) can start to come together.  Eventually they can close up tight and stop that leak.  This why I have a bit of an issue (actually quite a bit), of testing dwellings at -50 Pa.  This relates to a wind speed of 20 Mph which is much higher than some locations would experience on a regular basis and much lower than other locations average wind speeds.  As such, it is my opinion that their should be a standard test pressure PER geographical region.  This could be a table much like the climate zone charts, but would be based on the average yearly mean wind speeds for a specific area.  Homes in higher wind speed regions should be tested at higher pressures than homes in lower wind speed regions.

(Side bar - the reason the wind speed is important is that it is this force that will effect the pressures on a dwelling.  Yes a house can depressurize under mechanical ventilation, but these are usually infrequent where wind depressurization or pressurization of the dwelling could occur for months at a time in windy locations).

So - these tests showed that the house was VERY leaky.  What does that mean in terms of heating bills, comfort, and building durability.

Heating Bills

The truth is, this air leakage did not really make a huge difference in energy costs.  My heating bills (for space and domestic hot water) were typically well under $2000 a year (We are under $2000 for both gas AND electrical use).  As I am a heavy bath user, it is safe to say aprox 40% of this was domestic hot water use.  This leaves an estimated $1000 in annual space heating costs.  That works out to less than $100 a month, or well less than the cost of a weekend dinner out.

We typically had the heat set for 72-73F in the wintertime and basically did not tough the thermostat all year.  It was not uncommon for the heat to come on during cold late spring and early fall evenings.  We did however use a programmable thermostat that was set to come on at 7 AM, step down to about 65F at 8:30 AM, come back to temp at 4 PM, and step back down to about 68F at 11:30 PM.  This was only partially for energy savings.  The night time set backs were used because we had hydronic heating through large built-in wall registers (1-2 per room) via a 1980's gas boiler.  The pipes went through and rubbed on the wood sub-floor assembly, so if the heat came on during the night the 'clicking' would wake me up.  So we partially closed the bedroom door (so cats could still get in and out and not cause another source of nighttime wake-ups) and used an electric oil heater to maintain a comfortable temp in the bedroom.

While air tightness is important, it will not make a huge difference to your pocket book unless you have a very large and leaky house.

Comfort

The air leakage did however make a big difference in occupant comfort and should, in my opinion, be the biggest (and probably only) reason to upgrade an older home.  The house was uncomfortable to sit in near any exterior wall in the winter months due to the drafts present.  I was quite surprised when I saw how leaky the fixed, but home made, windows in the living room were.  The builder had just placed the single pane of window glass against a wood surface and clamped it with a second wood component.  At -15Pa, the wind just whistled through these locations.  There is no question, that making the house more air tight would have made the house more comfortable.

Durability

Normally when one discusses the reasons for making a dwelling air tight, it is in the context of a 'modern' home with current levels of code required insulation.  With modern levels of insulation, it is critical to ensure that air leakage does not occur, in order to prevent interior air leaking into the wall or roof assembly and condensing on cold sheathing.  Left unchecked, this will often lead to mold and rot within the assembly.

The key here is the qty and location of the insulation.  As soon as enough insulation is placed inside of the sheathing to allow the sheathing to cool down below the dew point of the interior air, you now have an assembly with a very high liability should any appreciable amount of air leak into that assembly from the conditioned interior. This is because air currents are the #1 mover of moisture next to bulk water leaks caused by plumbing leaks or incorrectly detailed cladding or roofs that permit bulk rain water entry into the assembly.

But in older houses like the one I took down (which had ZERO insulation in the walls), there is not enough insulation present to block the heat loss from the house enough to allow the sheathing to get to the dangerous dew point conditions.  If you never reach the dew point, you can have huge amounts of moisture moving into the wall via air leakage and never have to worry about it because it stays in vapour form and just moves on through either to the outside of the dwelling or back into the inside. There is never liquid water that results from this air leakage. This is the reason why older homes have performed so well over many decades without the presence of air barriers, vapour barriers, or even effective water shedding surfaces.  The heat loss has always been enough to 'cook' any accumulated moisture out of the assembly.

Conclusion

We have identified in this article that there is not a huge financial penalty for a leaky house.  In my case, the costs per month for space heating were under $100/month in what is considered a cold-heating-dominated climate.  This $1200 annual investment would not get very far in paying for a deep energy retrofit which typically would cost 10's of thousands of dollars.  Lets say you could reduce the heating load even as much as 75% (purely speculative and most likely could not meet), this would represent $900 annual contribution to renovation costs.

A REALLY cheap stud level renovation for my home (including new windows and doors) would have been at least $60K (going to need to rip out parts of bathrooms and kitchens so most likely will totally renovate those rooms - my budget of $60 assumes very low end cabinets for these rooms).

A very intensive attic floor plane sealing regime would have been at least $15K (not going to do this process without bringing attic up to current insulation levels when done).

At a highly inflated $900 annual savings, these two projects would have a 66 and 17 year payback respectively. The attic plane sealing payback would most likely be much longer as only sealing this plane would probably represent only 50-70% of all air leakage present and therefore there would be reduced energy savings.

And my house did not represent an unusual annual energy bill. This US Energy Summary shows that for the West, the average annual winter heating bill per household varies between $1300 and $800 depending on year.

In the end, due to our really low energy costs, and the likely hood that they will not appreciably escalate for many decades due to Government interference, it makes very little sense to upgrade an existing homes energy performance for personal financial savings.  Therefore the type of renovation needed to reduce air leakage or increase thermal performance, only makes sense if the home is being renovated anyway for cosmetic or occupant comfort reasons.

On a separate track - this logic also holds true when analyzing extreme new construction programs like Passive House.  The costs to reach passive house levels of energy reduction will not be paid back over the lifespan of the dwelling in most cases. The added detriment of these programs is that the embodied energy of the insulation products built into these dwellings also do not have a pay back within the lifespan of the dwelling.  Instead for new construction, it makes more sense to build a "Pretty Good House" (coined by Joe Lstiburek) and then use the excess capital available to either contribute to distributed or on-site energy generation.

It is however critical that air leakage be reduced down to a minimum (experts do not agree how little is adequate - but the number is somewhere between 1ACH+/-50 and 3ACH+/-50) for new construction or energy retrofits IF, you have built an assembly with enough insulation inboard of the sheathing to cause the sheathing to cool down to the dew point potential of any leaking interior air.   If you build a safer assembly with the insulation outboard of the sheathing (or enough outboard to maintain the sheathing above the dew point potential), then while air leakage is still important to address from an energy loss standpoint (the costs to get it right during construction are minimal and will be paid back by reduced energy usage), it usually will not cause a durability concern for the assembly.  This of course is all from the perspective of a heating dominated climate.  The direction of flow and order of layers for the assembly are different in a cooling dominated or mixed climate.




Top ↑

Foundation Rebar Installation Primer

April 23, 2015

Wow - cannot believe it was last November when I last posted to this blog!  I promise to start writing more technical posting (as opposed to the daily journal entries found at my building web site).

I posted this on my journal as well, but felt it was important enough to also post here.

I received some feedback to my journal posting yesterday that was suggesting I should look at the 'other' ICF manufacturers if I wanted to know how Rebar was 'supposed' to be placed.  I did and the result sure is scary.  Because you are allowed to install ICF walls without ANY engineering assistance (as long as you meet the building codes requirements including max unsupported wall height) and therefore engineering inspection, there is a plethora of miss-information out there regarding the requirements for rebar reinforcing of an ICF wall.

At least the BC Building code makes it pretty clear on the requirements, but I suspect that because the Municipal inspector is not present at time of pour, these requirements may not be adhered to - at least that is what is evidenced by one of the discussion forums I visited last night.

So - lets first look at the BC Building Code requirements.


The Horizontal rods are to be installed every 2 ft vertically and are to have 1-3/16" inside minimum cover (30mm) meaning that the rod is to be held off the outboard surface of the inside ICF panel to allow 1-3/16" of concrete to be present on the inside face of the bar.

The Vertical rods are to be installed per tables BCBC 9.15.4.5 A to C depending on core thickness and height of wall.  The first options calls for vertical rod placed every 16" horizontally with again 1-3/16" inside cover (30mm) minimum.

Obviously both vertical and horizontal bars are unable to occupy the same plane off the inside face of the foundation, so the code also specifies a max cover by stating the bars are to be "located located in the inside half of the wall section".

My requirements were much more stringent because of the height of the wall.  The engineer specified vertical bars every 12" horizontally and horizontal bars every 2' vertically.  I was not given a range for the vertical bar - it required 1.5" of inside cover.  When I asked if 2" or even 2.5" would be OK, I was informed that they would have to rerun all of the calculations and that they suspected there would be problems.  So, I did by best to ensure 1.5" cover.

My drawings also specified 1.5" cover for the horizontal bars, but I failed to abide by that when placing the bars.  Because I drew up the structural drawings (with the instructions received from the engineer), and had drawn the horizontal in the centre of the core, and because I am more of a visual person instead of word person - I placed the horizontal bar down the middle of the blocks during installation.  Fortunately, my blunder was forgiven.  When doing the calculations for the wall, the engineer had generally only used the vertical bars in the strength calculations and the horizontal bars were more present for crack control. I was very relieved (and thank-full to Tacoma for providing very fast responses to all of my rebar questions), as by the time I had discovered the blunder, all of the horizontal bar had already been placed.  While waiting for the reply to come the following morning, I tossed and turned all night worrying I was going to have to disassemble the wall or pay for a fibre additive to add to the concrete for strength, like the Helix fibre (you may remember from an earlier posting, I was looking at this but had ruled it out as being too costly considering it could not replace ALL of the vertical rods).

The most important point of this primer is that you MUST pay attention to the cover stated for each bar installation.  A bar placed without the appropriate cover almost becomes a bar that no longer contributes to the strength of the wall. For instance, if the bar was placed on the outside half of the core, you may as well not even have it there.  This brings me to the next part of my primer.

Rebar chair is used to hold rod at a precise cover off the inside face of the forms.
Why is rebar installed in concrete anyway? 

Concrete has awesome compression strength but is quite poor in tension. Because the weight of the back-filled soil is pressing on the foundation, it wants to  'bow' inward under the pressure.  This would place the outside half of the core into compression but would place the inside half under tension (just like a floor joist but in a vertical plane).  The inside half of the concrete core is trying to stretch to accommodate the bow.  As concrete is not good when pulled on, the stretching would eventually cause the concrete to fracture.  By placing rebar into the concrete, it prevents the concrete from stretching too far and fracturing.  The closer the bar is to the inside face of the concrete core, the more tension forces it will encounter.  Another way to look at this is the distance it would take to run or drive around the outside of a track compared to the inside lane of a track.  The further outboard you get, the farther you run or the longer the circuit is.

So, if your wall is designed with 1.5" inside cover, that means the engineer has calculated the stresses of the wall at that 1.5" plane and ensured to call out a rebar pattern that can accommodate those stresses. If there is not enough cover, then there will not be enough concrete to properly capture the bar and keep it in place, but if there is too much cover the rebar will not be able to remove enough of the load from the 'stretch' of the wall and the concrete will fracture. If the rebar was placed in the outside half of the core, it would no longer be subjected to ANY tension and in fact would be being squeezed by the surrounding concrete that is under compression forces.

While researching this last night I came across the installation instructions for a very popular rigid foam based ICF (and the manufacturer that was reportedly sued in the West Vancouver failure).  They instruct the installer to "Place plastic sleeves (1½" [38mm] conduit) over stub steel for later placement of vertical steel" meaning to slip chunks of plastic conduit over the dowels placed in the footing to later capture the bottom end of the vertical rod.  But as the dowels are placed typically down the centre of the footing, this would place the vertical rods down the neutral plane of the foundation wall, or a spot it will do very little good to resist the tensions of the foundation wall.

I also came across this forum on greenbuildingtalk.com discussing the placement of the steel and it was very clear a majority of the contributors did not truly 'get it'. Lets quickly correct some of the miss-information.  
  • Why do we tie off rebar under some circumstances?
Simply to hold the bar in the RIGHT position until the concrete has been poured and can hold the bar for us.  It provides NO structural strength whatsoever. 

So why is the tying off of the rebar inspected before pouring by the engineers? Why is it important that the tie-off securely fastens the bars together?  Because as we have discussed above, it is critical that the bar is placed in the right position to ensure it can bare the intended load.  As the tie wire is quite brittle, if the bars can move slightly because of not being tied-off tightly, there is a chance the sudden shock of the movement could break the wire which would now allow for the bar to move substantially out of position.
  • Is it important that the horizontal bars are tied to the vertical bars (something that cannot be done in ICF construction)? 
No - full stop.  Each orientation of the bar is typically handling separately calculated loads and not considered an 'assembly' (In some extreme cases I do believe it is a 'grid' that is designed, but in these cases sophisticated FEA software is used and the bar must be welded together not tied).
  • Is staggering the horizontal bars to capture the vertical bar the required solution?
No - this is only appropriate for above grade ICF installations.  In order to ensure the vertical bar was placed inboard enough on the core, the inside horizontal bar would not have enough cover.
  • Why is it important to tie-off splices?
You need to ensure that the bars are fully encased in concrete.  If the bars were not tied tight to each other, they would allow small pockets to form between the bars that were too small for the flow of concrete.  This would provide a weak point because the bar would now not be in communication with the concrete and therefore unable to bare the intended load.  This is why bars in close proximity, and in the same plane, need to be tightly bundled or held apart a minimum distance by means of chairs or other securing.
  • Why do the vertical bars not need to be tied-off or otherwise captured to the footing dowels?
Footing dowels or any other dowels have nothing to do with the tension stresses a concrete  assembly is under.  Their sole purpose is to tie the concrete on each side of a cold seam (concrete poured at two different occasions) together.  SO in the case of a footing dowel, the purpose is to ensure the foundation wall cannot 'slip off (shear)' of the footing.  This is why most codes also allow the formation of a key in the footing, instead of the dowels, to capture the bottom side of the foundation.

Hope this has been of some assistance. Should there be something that you disagree with, then please provide documented background for your disagreement and I will reconsider.

Thanks for visiting.
Top ↑

Choosing Materials

February 22, 2015
The green building movement makes a big deal about choosing the right materials to ensure a product can be reused or returned to the raw material market at the end of the life-cycle.  The end goal is of course to reduce the embodied energy of the project.

While this is a lofty ideal and worth pursuing, a reality check often shows that while a material is technically recyclable, there often (usually) not programs in place to actually process the used material.  During the deconstruction of my house, I ran into two good examples.

My kitchen floor was pure linoleum tiles (essentially linseed oil).  This is a product that can be composted or used as fuel for large scale heating boilers.  But in my region, there was no program set up to process the product and I ended up taking it to the landfill (I did not have the facilities to grind up and compost myself).

The second product I failed to recycle was all of the plastic pipe I salvaged from below grade.  This included PVC drainage pipe, PVC irrigation pipe, and ABS sewer pipe.  For this commodity, there was a program in place to recycle the material, but only if it was VERY clean (think like new).  The process available could not handle pipe with any dirt or other sediment on it.  SO in the end, it too had to go to the landfill.

Misc Pipe and Plastic that was not accepted at recycling facility.


While we should endeavour to reduce our footprint on the planet and choose materials with lower embodied energy, we should also ensure that the materials we do choose are the most suited to the application.

I see too many 'green' building designs that choose a 'green' product due to a promised carbon footprint as the primary focus, without ensuring the product will be durable long term in service. This often will result in the need to replace the product after a very short life cycles.  Even if the product can be returned back to the raw material supply chain, this still represents an increased burden on the planet compared to a competitive product that while being less 'green', is more durable in service.  And if the 'green' product cannot be returned to the supply chain, you are just that much further behind.

Instead, my focus is to start at the most durable end of the spectrum and then try to pick products with lower embodied energy characteristics from the high performance candidates, AND install the products per best practices to ensure they are as useful and durable as possible.

My long term hope is that the cost of new materials becomes so high that even the main stream players in the market see recycling as a no-brainer.  This would address the fact that right now, recycling often does not make sense from strictly a financial platform.  However part of the problem is also the technical challenges in recycling a product.

Fortunately, there is some visionaries that have been working for many years to solve some of these hurdles. Mike Biddle has been working on a system that can separate bulk shredded plastics into the different colours and materials solving one of the biggest stumbling blocks to mass recycling of plastics (read PopSci article for full storey).  The beauty of his system is that this is all done in N.A., saving the need to ship offshore, via an automated process (no high labour costs). By keeping the product on our shores, we reduce the pollution our society is creating within poorer countries.

Lets hope others are working on the myriad of other materials we as a society currently just discard.

Mike Biddle has developed an automated (IE cheap - labour free) method of allowing plastic materials to be ground up on mass and then separated into the individual colour and materials making up that mass.
Top ↑

Does PassiveHaus make sense?

October 15, 2014
Just a short update to showcase an article at Green Building Adviser that perfectly sums up the conclusions I made about the Passive House program and why I cancelled my plans to build to that standard.

The author of the article, found at www.greenbuildingadvisor.com/blogs/dept/musings/it-s-not-about-space-heating, tracked the actual energy use of several homes in Massachusetts and has determined that even a modest investment in insulation and air tightness (termed a pretty good house by Joe Lstiburek) is more than enough to reduce the heating and cooling loads to the point where it makes more sense to concentrate on plug and domestic hot water loads as is shown in the below graphic.


Extracted from http://www.greenbuildingadvisor.com/sites/default/files/images/Rosenbaum%20-%20Graph%20of%20Eliakims%20Way%20data%20copy.preview.jpg

The real world data monitoring has also shown that the assumptions made in the PHPP (the modelling system for PassiveHaus) are often wrong.  The author states, “PHPP assumes 6.6 gallons [25 liters] of hot water a day per person, but that’s not enough for normal Americans.”

I jumped on board the PassiveHaus train for about a year in the early design stages of my upcoming build.  It was easy to be swept up in the well polished program and fall in love with the projected savings.  But as I became better and better educated on building science, source energy, and embodied energy, I felt their were huge holes in the program.  The underlying principles of air tightness and thermal bridge free construction were sound, but in my view the chase for heating and cooling reductions bypassed the sweet spot where it made much more sense, from an embodied energy and a cost point of view, to look at on site production than further reduction. The biggest stumbling block was the claimed 10-15% added build cost to reach PH when in reality it is much closer to 200% on average when comparing to a code min house (which after all is what the majority of homes in North America are built to).

In the end I decided to build a "pretty good house" and will monitor energy loads once occupied and then model whether or not I reached the sweet spot between reduction and production.

Thanks for visiting.  For the current status of the build please visit http://www.theenclosure.ca/project-journal/

PS: For an excellent article on why  more insulation is not always better, read http://www.greenbuildingadvisor.com/blogs/dept/building-science/diminishing-returns-adding-insulation
Top ↑

Sub Slab Insulation - EPS vs XPS

September 1, 2014
As some of my regular readers know, I tested samples of EPS and XPS in an underground wet environment to see which over time absorbed more moisture.

I described the experiment design in my blog posting of Aug 22, 2013 and describe the start of the experiment in my posting of October 6, 2013.

Fig 1: Samples at beginning of experiment.  These were buried below aprox 4 ft of dirt in a wet environment subjected to regular/constant ground water.
 I dug up the samples March 25, 2014 and the results do not look good for EPS.



Table 1: Weight of buried samples at end of 9 months.
As you can see in table 1, over the same period of time and in the same conditions, EPS absorbed an average of 258% of its original mass in additional water compared to only 31% for XPS.

Once I finished my on-site testing of the samples, I then took them all down to Fitsum Tariku, an instructor at BCIT and Director of Building Science Centre of Excellence (to name just some of his many accomplishments and titles). Fitsum offered to have some of his Masters students in the Master of Engineering in Building Science program run some experiments to determine the total moisture take-up potential of both products as well as the thermal resistance once saturated.

Unfortunately they were unable to use my buried samples because they were too damaged (I should have bed them in a thicker layer of sand both below and above to protect the integrity of the samples - however it was still a very revealing test based on my results in table 1 above).  Instead they used samples I had submerged in a tub of water and others I had on a shelf during the experiment.

In the following tables, you can see that EPS also does poorly from a R-Value retention point of view when saturated compared to XPS.

Table 2: Dry weight of samples measured by BCIT
Table 3: Measured R-Value (using Hot Box) of both dry and wet samples
Table 4: Difference in R-Value between two insulation types both when dry and wet.
Table 5: Loss of thermal resistance when saturated.

The last graphic tells it all - EPS looses 15.7% of its thermal resistance when in a wet environment and saturated compared to only 3% for XPS.

So why is EPS used in many 'green' projects.  This stems from the EPS industries claims that it represents a lower Global Warming Potential vs XPS due to its use of Pentane as a blowing agent compared to the traditional HCFC agent used by the XPS industry.  But XPS manufacturers like Owens Corning have already replaced their blowing agent with a Zero Ozone Depleting formula.

Finally, one positive recorded result is that both products met or exceeded their published thermal resistance per inch of R4.27 for EPS and R5 for XPS (as shown in table 3 - dry state). 

The outcome in our view is pretty clear cut - over the extended period representing the lifespan of a dwelling (50+ Years), the lower initial thermal resistance, and then the significant deteriorating of R value if EPS gets wet and stays wet, far out-way any environmental benefits claimed for EPS.  The obvious choice for below slab insulation applications is clearly XPS when all factors are taken into consideration.

Sample Specifications:
XPS - Owens Corning Foamular C-300 (30 psi) 
EPS - Plasti-Fab PlastiSpan 30 (30 psi) 
Top ↑

Clothing Charities

July 4, 2014
I was going through my notes and thought I would post the charities I researched on the North Shore (Vancouver BC) that deal with woman's clothes in case it helps anyone else.  All have worthy clients they are assisting.

http://avalonrecoverysociety.org/

http://dressforsuccess.org/home.aspx
(Clothes must be cleaned and no receipt.  They do not take casual.)

http://www.harvestproject.org/programs/thrift-store-2/

http://nscss.net/

www.northshorewomen.ca

Cheers
Top ↑

Missed Deadline - again!

June 15, 2014
Well as you can see by the web-cams, we are no where near ready to start the big dig.  So today's' deadline will come and go like many previous.

The deconstruction is now going pretty much to schedule, but we just did not start soon enough due to all the lost time re-engineering the structure to meet the new District policies. May was meant to be tear down month but both April and May were generally spent on re-engineering and drawing and getting the house fully empty.  This is one downside to doing ALL the work myself -  There is no overlap.  In general, I did not start this project prepared.  I had intended to purge and empty the house over the winter, but was generally fully occupied with drawing, redesign, and variance approvals.

I have pretty much given up on a schedule at this point and am just working as hard as I can each day to move forward. The actual deconstruction did not start until May 12 with the removal of the Kitchen followed shortly after by the laundry room.  We then had to prepare for the asbestos remediation. Since the remediation of the asbestos laden drywall completed June 4, I have been able to lift up aprox 650 sq. ft. of beech hardwood flooring (including grinding off nails), removed wood panelling from hallways,  removed all of the wood planking that was installed behind the panelling, and as of yesterday remove all of the non-bearing internal walls.

Front entrance at back left.   White wall used to be bathroom and back right was spare bedroom.  Wall in foreground is the central bearing wall holding up the ceiling joists.

Foreground was dinning room and stack of salvage 2x4.  Room behind brick chimney was laundry utilities and room to right was kitchen.  The few renaming posts are holding up some splicing in the ceiling joists near a roof valley above. Just visible behind chimney is a remaining bearing wall holding up ceiling joists at the south half of the house.
 Over the next week I hope to stack the salvaged wood outside (need to figure out where as really tight on space!), take a garbage and green waste run to the transfer station, pull up the sub-floors (this is plywood screwed to ship-lap, nailed to 2x4 sleepers. When we had the hardwood put in, I installed about 18 pounds of screws in the sub-floor to reduce the creaking that was present.  There is no way I will have the time to remove all of these screws to salvage any of the sub-flooring, so I will just be cutting it into 4ft x 4ft panels and taking to dump unfortunately), and then start taking off the exterior siding.  This should be much easier using the offset for the reciprocating saw I talked about on an earlier posting.

Lets see how well I do meeting this goal.

Thanks for stopping by!


Top ↑

Thermal Bridging - The New Buzz Word

June 13, 2014
Just a short message tonight.  I finally got around to reading the Winter 2013 Journal of Building Enclosure Design and it was chalk full of articles on the importance of preventing thermal bridging across balcony slabs.

This is a hot topic in most BE circles right now.  Even as little as 5 years ago, most energy models ignored the thermal bridging that results at this interface, but as I wrote a couple of days ago, even though the slab only represent around 3% of the total wall area, if not thermally broken, it can easily diminish the entire walls thermal resistance by 50% or more.

The construction industry and building designers are finally listening to the Building Scientists and realizing that details really do mater!  We need to start building smarter because there are too many Aqua Towers in this world.

Thanks for stopping by and please visit my project journal often as I am posting almost daily now.

Cheers!
Top ↑

RCI Conference

June 10, 2014
Sorry for the repeat to those that follow both my Blog and Journal, but this info was too good to miss.

Please visit http://www.theenclosure.ca/project-journal for the lunacy surrounding slab edge thermal bridging, double stud construction, and wrapping buildings in foam.

Thanks For Visiting!
Top ↑

Removing Hardwood Floors - The easy (ier) way!

June 7, 2014
One of the tasks I was not looking forward to in the demo of our existing house was the task of pulling up the approx 650 sq.ft. of hardwood floor.  I had done some of this in the past and it was a bear.  It is murder on your back and takes for ever.

I put about 2-1/2 hours into it yesterday and did about a foot by 40 ft.  Each row was taking 5-7 minutes and based on this rate the whole living and dinning room (only part of the job) was going to take me 19+ hours.  I started again this morning and after a few rows I was second guessing my decision to save the floors. 

My back is already not the best and I knew that I was not going to last doing this the traditional way.  Almost any example you see of pulling a hardwood floor that has been nailed down uses the following tools.

Typical tools used to take up a hardwood floor.

But I had vowed on this project that I would work smarter and not harder.  I decided to 'waste' half an hour going to the lumber store to see if there was any better options.  Boy am I glad I did.  I ended up buying a 6 lb sledge on a 36" handle and a pick/axe.  Now you may be wondering how these two could work together.  They can't untill you modify them.

The beginnings of a beautiful thing.
 But by cutting off the pick, you are left with a lovely flat spot to whack the 'axe' in under the tongue on the flooring.

Finished tools work very well together
This cut the time per row down to under 2 minutes or a savings of apprx. 70%

 
This example took just under 4 minutes.  I was able to hone the method down to around 2 minutes per row.
A panel lifter is also useful but in the end, I just used my modified tool to do everything.

 The following is a time lapse of the entire floor removal.  As you can see, the timing spead up considerably with the new tools in hand.


I found that working on the individual pieces from the middle of the piece was the most effective to lifting it out. Often the grove side joint broke, but these will be easily added back with a router. And considering the increase in speed this method afforded, the extra work to put new ends on some of the boards was well worth it.  I will now look to find a labourer to grind off all of the protruding staples (I believe this will be much faster than trying to pull out with pliers).

Thanks For Stopping by.

Top ↑

Support Costs and Advertising

June 7, 2014
When I started this blog exactly 2-1/2 years ago, I thought it would be a place for me to collect my thoughts, express and debate my point of view, and generally document my experiences while I designed and built a energy efficient home.

The experience has blown me away, and I cannot believe the response.  I look forward to the messages I receive weekly from some of the readers.  I also appreciate the silent majority that are in the shadows but stop by regularly.  I was amazed when after only 1 year I had 1000 visits.  I am blown away that a short 1-1/2 year later we are over ten thousand hits and I am averaging 1000+ hits a month.

Right from the beginning, I made a decision to not monetize this blog.  I did not want my readers to be bombarded with adds.  I want the hyperlinks present to be those I added - not Google. At the same time, the costs to host the content featured in this blog are starting to add up and I would like to do even more, but I really cannot afford to divert the funds away from the build.  Between websites, cameras, and camera hosting, I have spent over $6K to date and that will start to climb as the volume of content increases and I exceed both my broadband and hosting bandwidth.  I just had to upgrade to a higher Shaw 'business' service because I was exceeding my monthly bandwidth.

SO - I have made the decision to accept donations from those who feel so moved to provide.  You will see the donate button at the top right of my blog.  Any amount, no matter how small is appreciated and if you are not moved to donate - no worries - the blog will continue for your enjoyment.  I will use this money to pay my monthly hosting and camera costs and to improve the camera service.


If you do not have a Paypal account just click the  continue bottom to use any credit card.

Thank you in advance for any of your generosity!


Top ↑

10,000 + Hits

May 26, 2014
WOW!  Never in my wildest dreams would I have thought that my measly efforts to document one persons quest to build a sustainable house would receive such a large and wide audience.

I am humbled and encouraged by your support and interest.

THANK-YOU!
Top ↑

Working Through a Braced Wall Panel and the Cost to Protect Trees

May 9, 2014
Earlier in the week my engineer discovered a design blunder I had made on one of my Braced Wall Bands.  I had not ensured that I had a Panel starting within 2.4m of the band edge.

You can read about my fix on the Project Journal

In the meantime, I received two quotes to provide stabilization to my excavation bank around two sets of trees using driven anchors and shotcrete.  One was $30K and the other up to $45K!  I just about had a cow!!!  This is well outside my budget and is not going to work for me.

So I will need to come up with other solutions and will possible need to take down one tree (unpopular choice with me, my wife, and the neighbours).  I will work with the arborist during the air spading to see if we can get any closer to the trees without disturbing structural roots.

For the south elevation, the worst case scenario is that I will need to stabilize the bank using large concrete blocks (2.5' x 2.5' x 5').  I am told this would cost a few thousand. For the NW corner tree, my only option will be to use the blocks.  But this will only be possible if there is no structural roots where the blocks would need to go.  We would need to excavate within 1.5' of one side of the tree if we are going to be able to place these blocks there.  Otherwise, I will need to take down this lovely tree :-(    I will only find out once excavation starts.

In the meantime, I work to empty out the house and start the deconstruction.

Thanks for visiting.
Top ↑

Batt Insulation - Not all are poor!

April 23, 2014
Gregory La Vardera posted this excellent primer over at Green Building Adviser on the differences between fibreglass and mineral wool batts.

As Gregory points out, ROXUL Mineral Wool batts are not associated with the typical failings of a fibreglass batt installation. This is due to the density of the product and the ease of cutting and trimming. The product also sheds water and is fireproof.

My only critique of his article is is statement "I don't need my insulation to make an air seal, because I used that good ol' housewrap on the outside. Nope, nothing wrong with housewrap — but it provides no help with the air sealing you need at your vapor retarder. The air seal in this case wants to be on the warm side of the wall, to prevent interior moisture from entering the wall cavity and condensing during the winter heating season."

This is actually incorrect, an air barrier ANYWHERE in the assembly will block air flow through the assembly.  I will talk more about this in an upcoming blog entry.  For now, I did not want to detract away from the rest of the posters review of ROXUL mineral wool insulation.

Top ↑

Blog vs Journal

April 12, 2014
I just want to give a heads up to regular readers of this blog that I will be reserving future posting for the more in-depth postings regarding materials, processes, and Building Science.

I will be making the more regular (hopefully daily once I start building) postings, describing my day to day struggles of building my own house, to the project journal at theEnclosure.ca

You can subscribe to this journal page if you want to automatically receive the updates.

I want to thank you for the amazing support you have all shown by being regular visitors of this blog.  When I first started it, I would have never imagined I would receive over 1000 visits a month.
Top ↑

ENGINEERING GUIDE FOR WOOD FRAME CONSTRUCTION 2009

April 12, 2014
Looking to borrow a copy of the Canadian Wood Council's ENGINEERING GUIDE FOR WOOD FRAME CONSTRUCTION 2009 from someone in the Lower Mainland Greater Vancouver Area. 

Hopefully Saturday AM.  I have ordered a copy but it will be a week or so coming and I would like to get a handle on Part C over the weekend if possible. 

If you have a copy I can borrow, please contact me at building@senwi.ca

Many Thanks
Top ↑

Death of Part 9 construction?

April 9, 2014
Never would I have guessed that the Building Permit process would be the biggest stumbling block in building your own house.  I know the building code quite well and had ensured my design complied with it.  What I did not allow for, and what may shut me down, is bureaucracy.

It seems that there is a general movement in Municipal building departments across the Lower Mainland to 'opt-out' of Part 9 construction now that this part of the code includes 9.23.13 Bracing to Resist Lateral Loads Due to Wind and Earthquake.  Whether the motivation of the Municipalities is based on fear (many may not be adequately trained on the new requirements that were enacted just last December), or from a perceived workload concern - I am not sure.  It may also be an unjustified fear of liability perceived present if they are responsible for ensuring a dwelling meets the new Part 9 requirements.

Whatever the motivation, the outcome may very well be the death of Part 9 construction in parts of BC and the significant increase in construction costs as a result.  With the added costs of an 'engineered' approach to the Lateral Load design expected to be somewhere in the $20K - $30K range )most of this would be for the added Simpson hardware utilized in most engineered designs), this 'component' has gone from $0 to one of the most expensive components within the home, on par with a high end window, cladding, or HVAC package.

For me, the removal of my ability to generally design and build my own house is similar I am sure to how some Americans would feel if your tried to take away their guns.  I have always felt it is my right to design and build my own house via the prescriptive path of Part 9 in the BC Building Code.

Yesterday, I was informed that this right is being taken from me.  The DNV building department manager has informed me that my architecture is 'complex' and as a result, they will require that the entire structure is engineered including the lateral bracing requirements.

"We consider your proposal combining part 9 prescriptive design with part 4 structural components inadequate in providing lateral support against high wind and seismic forces.


We consider this as a complex design and as such we, the Authority having jurisdiction, decided not to accept the design path and therefore require you to have a Structural Engineer design and provide signed, sealed drawings for the entire structure."

Many of you will be saying, we have combined Part 9 and Part 4 design for decades and you would be right.  In November of 2013 it would be very common to have a primarily Part 9 designed dwelling that also included manufactured components designed to Part 4.  These components would include manufactured floor joists, beams, and roof trusses.  

What changed?  Well the building code introduced lateral bracing requirements in high wind and seismic zones.  This includes the Lower Mainland of BC and the Southern Vancouver Island region.  The requirement became effective in Dec 2013 and right away a controversy developed.  APEGBC in their infinite wisdom decided that the Part 9 lateral bracing prescriptive design was inadequate to resist high wind and seismic loads.  Now of course we have decades of experience showing otherwise, but they have drawn their line in the sand and refuse to budge.

So while engineers are allowed to design to the rest of Part 9, they are specifically not allowed to use 9.23.13  and must instead design the lateral loading using the Canadian Wood Council guidelines or utilizing a 100% engineered approach (Part 4). And the problem with these approaches (granted based on my limited exposure) is that it is a LOT more expensive to build in this manner as it usually includes significant volumes of manufactured Simpson Strong-Tie hardware.  On a house under construction that I often visit, I was quoted a cost of $16K for just the anchor bolts.

Whether this controversy has influenced the building departments, I do not know, but based  on comments made by the DNV manager, many Lower Mainland building departments are getting out of the Part 9 business.  

Personally I question if this is an abuse of the Municipalities power over the code implementation and feel the need for Victoria to step in and mandate Municipal support for Part 9 design and also introduce a detailed frame work that identifies the conditions that must be present in a design before the AHJ can deem that design as 'complex'.  In short, I believe it is time for a major overhaul in how the Building Code is implemented across the Province to ensure a consistent and fair application across AHJ.

In the meantime, I urge you to specifically ask your Municipality what there requirements are going to be while you are still early in the design.  I was notified of my Municipality's unwritten policy after the design was complete during my building permit application meeting.


Top ↑

The End?

April 8, 2014
This has been a particularly poor day.

You can read about it on the build websites journal http://www.theenclosure.ca/?p=541

In a nutshell, it appears my dream to build a Part 9 affordable structure is coming to a close without too many options I can afford.

Really not sure what my next steps will be and ironically, my services were disconnected this morning and I do not even have the opportunity to move back in.

Time to go for a walk - Sorry for the downer but thanks for letting me vent!
Top ↑

Variance Approved and Website Launched!

March 28, 2014
Wow, a lot has happened since my last update. 

For starters, we have moved.  You can read about the first few days of the move over on my journal at theEnclosure.ca It was a tiring and stressful time that I am very happy is behind me. Of course this was followed up by a week of sickness and a computer data loss that was the worst I have had ever experienced but fortunately I have been very lucky in this regard and so this was not crippling for me (just expensive - the whole affair cost over $1000 for data retrieval and the purchase of a second battery backup so both my Raid servers are protected).

The next piece of big news is that our Development Variance permit was approved last Monday night.  This was such a relieve after months of back and forth with the District.  They accepted my originally proposed upper to lower floor ratio of 87% (vs. the 75% required by the bylaw), but I had to redesign the roof so that I could lower it 12" and now only be 8" above the requirement of 26'.  This has resulted in the loss of my air barrier design utilizing a torch on membrane, so I will have to come up with a new game plan for creating a durable and effective air barrier at the ceiling location. Ideas anyone?

We have also been approved for our Construction Mortgage and I am thankful for the hard work put in by Tetyana Thomas at the Royal Bank.  They have really stepped up compared to most banks that would not loan to an owner builder. The challenge will now be to get to the first draw.  They will not advance funds until the foundation is complete.  This will cost well over $100K to get to with all of the permit and engineering costs built into this phase. I am still not sure where this money will all come from and we are going to need to do some MacGyving to get through this stage.  The ironic part is that they are then willing to advance 40% of the land value at the first draw which is ALL of the funds I will need to finish the project.  The appraised value for the finished structure is over $2M in today's market and they felt I should be spending over $800K to build.  I expect to spend less than half this due to my own sweat equity, salvaged materials, sponsorship, and a lower importance that both my wife and I share towards the 'lipstick' of a house.

Yesterday, I also received the final sealed drawings from the Structural Engineer and the GeoTech report.  This is the last part of the puzzle needed to apply for the Building Permit which I will do next week. Unfortunately the first appointment available was Thursday as I will be at a THERM training course all day Monday and Tuesday.

The gas/storm/sani/water services should all be disconnected next week and I will have Hydro swing the electrical service over to the new temp pole as soon as I finish installing it and call for inspection.  I hope to get this done this weekend.

But the greatest achievement was the launch of the project's website theEnclosure.ca I cannot thank Honeycomb Creative enough for their work on this site.  It is first rate just like all of the other work they have done for me.  I invite you to stop by and browse through the information that is available including a full copy of the plans, building assembly descriptions, and lets not forget the 'live' (actually snapshots updating every 3-5 seconds) video of the build site.

As I get caught up, I will post more information on the Varriance process for those that may need to go through a similar process.

As always, thanks for stopping by!