Project Journal

Website Update

December 21, 2015
Just a short note to let everyone know that I have finally uploaded a couple hundred images to the photo gallery.  I completed the demolition folder and also brought the foundation folder up to current (except for photos of garage slab pour).  There is
Read More...

Disappointment

December 21, 2015
Disappointment is the emotion most prevalent over the last week.  Now that all the floor assemblies are installed over the basement, it is dark - really dark.  So last Thursday I finally installed some construction lighting in the basement and I had qui
Read More...

Suspended Concrete Slab – Complete

December 10, 2015
The suspended concrete slab for the garage has been poured! As hoped, I was able to push up the date and we poured at 11 AM on Monday.  Hi Def Concrete and F&F Pumping did a bang up job and by 12:45 the pumping was done and by 2 PM the fat lady ha
Read More...

Huff and Puff

December 3, 2015
Well, I survived yet another wind storm but this one was close. I repeatedly cringed as I heard the tarp fill up with air and then I heard the sound I dread, staples popping off and looked up to see about 8ft of the seam between the north and south tar
Read More...

All Barred Up

November 30, 2015
As hoped, the last week has gone quite well and I am very close to being ready for the garage slab and basement walk-up footing pour.  I am just waiting for some direction from my engineer in Ontario regarding the rooting of rebar around the walk-up land
Read More...

Another First

November 22, 2015
Well, I could get used to this, it was another productive week that stayed on schedule.  In fact, things actually took one less day than planned so I was able to catch up on some chores and vendor follow up on Thursday. Monday to Wednesday saw the rem
Read More...

Video Updates

November 15, 2015
Hey folks, Just a quick update to let you know I uploaded a series of videos today.  You can access them by clicking links below or by clicking on my YouTube channel at the left of this screen. Roving Cam Time Lapse Videos August: Major activiti
Read More...

Steady Progress

November 15, 2015
I just love times where construction actually goes according to plan.  They have been so few and far between in my experience, that when they do happen, it just makes life good. Such is the current situation with the garage slab forming.  You may rem
Read More...

Mud!

November 2, 2015
Hey folks, just a fast update as not a lot has happened in the last week. I got Alfie's shoe back on last Thursday, but it was clear my soil screening days were over for the season.  Everything is now just mud and the soil is not separating from the r
Read More...

Lost Track

October 27, 2015
The last week has progressed well.  It has been reasonably dry and I was able to get a lot of the backfill complete.  The back west wall is almost complete (put it aside to do other weather dependent things).  Mr. J was by on Friday and we were able to
Read More...

In the name of Science

October 19, 2015
Well. I am extremely grateful I moved Alfie to the back yard last Friday as by Saturday AM, about 4ft of the back-filled south bank had caved in.  If Alfie was still on the front bank, I would have had a lot of work to hand dig out the cave in and rebuil
Read More...

Alfie goes for a stroll – At last!

October 9, 2015
Well, it has been exactly 13 months since Alfie was banished from the back yard due to the excavation activities last September 2014.  Today, Alfie was once again able to stroll into  the back yard (ok - it was more of a steep climb).  I finally comple
Read More...

Uncompacted Schedule

October 4, 2015
Well, I continue to be wildly optimistic in my backfill schedule. Even with assistance, this process is taking a LONG time. I can certainly understand why NO ONE does this in residential construction. I have averaged only one lineal ft every 4 hours (o
Read More...

Frozen

September 25, 2015
I have had a couple enquiries asking how today's surgeon visit went so here is an update. While it does look like I have a torn labrum called a SLAP tear, I would not be surgical until at least the current swelling and tightness subside.  I have sever
Read More...

Water Leak – ✔

September 24, 2015
Well, I have not progressed yet to the backfill stage, but a lot has been accomplished. When I hoped for backfill operations last Friday, I did not account for how many operations had to be completed first and my significantly reduced work days. But en
Read More...

Image is everything!

September 14, 2015
Hey Folks, It is your friendly neighborhood cripple - OK I exaggerate, I am not that friendly :-).  Not a lot has been going on.  I had my MRI imaging of both the shoulder and lumbar spine on Sept 2 and now have a much clearer picture of the road ahe
Read More...

Back Again – Now What?

August 31, 2015
Well, today was to be the day I was going to start back at the jobsite. I had taken the last 2.5 weeks off to rest the shoulder to see if it made any difference. Instead of getting better, it continued to get worse, so I thought I may as well go back to w
Read More...

Time for reflection

August 25, 2015
Well, if I have had anything over the last 1+ week, it is time.  I am sticking to my word with the medical team and not doing anything at the build site for a 2 week period (possibly more). My only activity at site last week was to move some backfill
Read More...

A break for a break!

August 16, 2015
After having a conversation with a nearby resident who reviews my journal, I realized I had not explained why I was in a funk on my last posting.  Just as well, as the situation has changed dramatically again since last week. Over the last month or so
Read More...

Coming out of the hole.

August 11, 2015
Sorry folks - I know it has been a while since the last update.  To be frank, I have been in a funk and have had a lot on my plate!  Lets bring you up to speed. On July 28th I passed my perimeter drainage inspection with flying colours.  To be hones
Read More...

Drained

July 28, 2015
The last week has proceeded well and of this afternoon I have finished installing a perimeter drain field.  All runs have been routed and tied into the deep pump-up sump.  I was lucky, about 40% of the pipe was above the gravel fill in the bottom of the
Read More...

Torched

July 20, 2015
Quick housekeeping: I have been asked by one viewer to be a bit more consistent and post my entries on the same day each week so they do not have to constantly check.  Good news, you can now subscribe (just enter your email to the top right), and you wil
Read More...

Transition

July 11, 2015
It actually has been a productive week despite my continued exhaustion (I have not slept through the night since breaking my shoulder 7 weeks ago). I finished repairing the bag footings by Tuesday (ahead of the schedule I had set at the beginning of the w
Read More...

ShedCam Time-lapse Videos Complete – Finally

July 5, 2015
I finally put aside some time today (was too smokey to go outside due to the forest fires in the region) to start going through 10's of thousands of time-lapse images I have been collecting from the various webcams.  My Roving cam was fairly up-to-date,
Read More...

B.A.T. Jr.

July 4, 2015
Well it is not the glory of last falls B.A.T., but b.a.t. Jr. should due the trick until I have the back fill complete and am ready to put up a new main tarp. [caption id="attachment_1843" align="alignnone" width="300"] Offspring of last falls Big Ass
Read More...

Floor Installation – ✔

July 3, 2015
Steady progress has been made over the last week and a half, and I now have 95% of the first storey floor installed.  This has been quite the struggle with one usable shoulder and the unbearable afternoon heat, but I pushed forward each day as best I cou
Read More...

Website Enhancements

June 22, 2015
Today the website was updated to add a search utility to the Journal as well as a subscribe feature.  Enter you email address and you will ensure you never miss the next instalment in my saga to build a energy efficient and sustainable house. Both of
Read More...

I’m Floored!

June 22, 2015
Despite being one armed for the last 4 weeks, I have been able to progress the build enough to start laying down the floor deck and placed the first 4 sheets today! Since your last visit the following tasks were completed: finished framing the bas
Read More...

Not all that it is cracked up to be!

June 11, 2015
I had my three week check up with the surgeon at the cast clinic today and got quite a shock.  Part of the procedure was to get a new XRay and this time I was able to see the results.  What I had previously understood was only a hair line fracture was a
Read More...

Framing has commenced!!!

June 9, 2015
Well, against all odds, I framed a wall today! I know, not very impressive really - but I did it with only one working arm. [caption id="attachment_1757" align="alignnone" width="300"] I built a quick table to assist in framing the walls. This allowed
Read More...

One Armed Bandit

June 4, 2015
Yesterday was the first day back to the site since my shoulder injury 2 weeks ago today.  I was pushed to be productive by Ted who came by to lend a hand (or two). The next task was to level out one of the internal footings that had settled before the
Read More...

Windy House and Power Plants

May 30, 2015
Prior to tearing down the old bungalow I had the air leakage tested by H&H small space solutions.  I posted the full results of the testing on my Path to Sustainability blog. On further reflection of the topic, there is one addition reason I belie
Read More...

Just broken

May 25, 2015
Well I received the good news from the surgeon.  It was a clean break and there does not appear to be any nerve or tendon damage. So no surgery! Just a min of 6 weeks with no loading on the arm. I am going to lay low this week and already had a trip p
Read More...

Out for the count

May 22, 2015
The last week has seen reasonable progress in the 'hole'. I finished cleaning out and re-attaching the bag footings on the inboard side of the foundation and then worked with Pat from embers to level the gravel for the first 48" around the inboard side
Read More...

Rim Boards Complete

May 13, 2015
As hoped, the rim boards started to progress more quickly once I had the right drill bit. Friday saw the west wall and jog at NW corner complete before I stopped to pick my cat - Blackberry - up from the vet after dental surgery (two teeth were removed
Read More...

Trouble getting Anchored!

May 7, 2015
Well, so for this has been a frustrating week with very little progress. It started off OK Monday. Ted came by and we measured all of the as poured foundation so that I can update my AutoCad model with the actual dimensions.  We also finished prepping
Read More...

Roving Cam Time Lapse

May 3, 2015
March and April Time Lapse from the roving cam have been uploaded
Read More...

Curb Appeal

May 2, 2015
Now that I have finished stripping both sides of the forms, I have to say I am quite pleased at how well the top curb turned out using the Roxul ComfortBoard IS inserts.  They did not compress at all and created very nice pockets that will allow their re
Read More...

Blowout Blues and My Friend Murphy

April 29, 2015
This week saw a return to the job site after spending ALL of last week catching up on the bookkeeping and preparing our taxes.  I was a lot further behind than I thought and had not reconciled the accounts since last August.  I also had some technical h
Read More...

Pre-Pour Site Visit

April 22, 2015
For those interested, I did a pre-pour site visit video.  Sorry for sound and video quality.  Did not realize it was so windy and also that I was so shaky that day.  I will also post in next day or so a compilation of snap shots of the pour process.
Read More...

Relief!

April 21, 2015
Yesterday the foundations were poured and I am relieved on so many levels. 1) Last Oct/Nov - I would have never imagined that my back would have held out while I installed the 50-100 lb ICF blocks (depending on water content).  But with the help of Dr
Read More...

Where’s the concrete?

April 16, 2015
I have had a few people today ask "what happened to the concrete?"  as today was my scheduled pour day. Well - what else - there was a delay :-) Last Sunday I knew I was not going to be ready for today and postponed till this coming Monday and now
Read More...

On the Level!

April 10, 2015
It has been a great couple of days. I have now received the sign-off on the structural inspection of the forms.  I had given Tacoma a heads up that Brian from Stantec was coming and needed a fast turn around.  Well within 45 minutes of getting Brian'
Read More...

Thank full for friends

April 8, 2015
It has been a reasonably productive few days.  On Friday Ted was by and we were able to install the crucial vertical uprights, on the outboard side of the foundation, needed to install all the whalers at the top of the formed curb that will sit on top of
Read More...

Foundation Rebar Primer

April 5, 2015
I received some feedback to my journal posting yesterday that was suggesting I should look at the 'other' ICF manufacturers if I wanted to know how Rebar was 'supposed' to be placed.  I did and the result sure is scary.  Because you are allowed to insta
Read More...

Final Foundation Push

April 4, 2015
Sorry for the silence folks, I have been on the final push to finish off the foundation forming.  I have my structural inspection, and also my survey, scheduled for Tuesday the 7th, and will try to schedule the District's inspection for the 9th or 10th l
Read More...

ICF is complete!

March 24, 2015
I hit a milestone this last week and finally have finished laying all of the Durisol ICF blocks.  I generally finished off row 9 last Friday, the majority of the required cut blocks for that row on Saturday afternoon, and the last few blocks above the ba
Read More...

Altitude Sickness

March 15, 2015
This last week has been a mixed bag of activities.  I started Monday with the raising of the scaffold to the final pouring height, which will also be used to place the last two rows of blocks and to form the top of foundation wall curb.  I have been wor
Read More...

7 of 9

March 5, 2015
While 7 of 9 was my favourite crew member on Star Trek, it also represents my progress to date on the ICF courses.  I have row 7 about 75% complete and then will only have two more rows of ICF to place before starting on the top curb with all of the insu
Read More...

Sky-bridge open for traffic

February 27, 2015
This week ended up being ALL about scaffold.  I anticipated it would only take a couple of days, and 80% of it was finished by Tuesday PM.  But then I got into the cold room under the garage and the 'tower' I needed to build to get out of the pit, as I
Read More...

ICF Rising

February 21, 2015
The last week has seen some great progress at the site.  By last weekend, I had all the forms stripped, all the form wood sorted and stacked, and had started the second row of ICF. [caption id="attachment_1589" align="alignnone" width="300"] Form lumb
Read More...

Goodbye

February 16, 2015
This morning I said goodbye to a kind and dear neighbour.  Joan had been with us for 92 years and right to the end was full of life, generosity, and a kind spirit.  She had a great sense of humour and was always welcoming to me and my wife over the last
Read More...

Stripping

February 11, 2015
This week is all about stripping - the forms that is! Ted came by yesterday and we got a good start on pulling up the rental stakes and I was able to return 100 at lunch time.  After lunch we continued pulling up the stakes and got all done except for
Read More...

Thankful!

February 9, 2015
Several of you have been hounding me asking "So - How did it go?".   I am thrilled to advise it went quite well and I am thankful for those that helped me get there! So let's catch you up from your last visit.  On Monday I got the sign off from the
Read More...

The Big Day has arrived – Tomorrow we pour.

February 4, 2015
I am far too tired to give a lengthy update and still have some instruments to finish preparing tonight that will be imbedded into the concrete, but I am pleased to say the day I thought would never arrive is just around the corner. Tomorrow, I finally
Read More...

Footing Forms

February 1, 2015
This week has been all about getting the footing forms finished so I can have inspected and pour this coming week.  Wednesday and Thursday saw the basic XPS forms in place for the internal strip and pad footings. Friday I lined the forms with Poly (risin
Read More...

In the trenches

January 27, 2015
The last few days have seen lots of progress - unfortunately lots has been for the second or third time. It finally was dry enough Saturday to finish the sand overfill of the teck cable. As I had a morning back treatment and Saturdays construction hour
Read More...

Rub-a-dub-dub

January 23, 2015
Well today was a wash.  Nothing like 3" of rain to ruin your plans for the day. Instead of finishing the sand fill over the teck cable and starting on the internal footings, I spent the day on emergency storm water duty.  I awoke this morning to a fr
Read More...

Day by Day

January 22, 2015
Day by day, I am making progress, granted not the progress even a small crew would make, but I am after all 1 man. And if I am sick, injured, needing to do office work, or diverted to any of life's other requirements on my time, I am obviously not going t
Read More...

Alfie is free!

January 19, 2015
Today Alfie finally gained his freedom from the pit.  I hired Payless Towing to assist in Alfie's extraction from the pit.  It only took about 5 minutes but was a very tense time.  The ramp slope was one thing, but with half the ramp washed out, it was
Read More...

Time Lapse

January 14, 2015
As feared, I succumbed yet again to illness. This has been a very unusual time for me.  I have not been sick like this since the mid 90's and even then I would only get sick once and not back to back like this.  It is clear my immune system is very week
Read More...

The good, the bad, and the ugly.

January 9, 2015
Well this week has presented the full gambit of emotions and experiences. [caption id="attachment_1526" align="alignleft" width="168"] Middle internal Footing - Gravel Bed[/caption] [caption id="attachment_1527" align="alignright" width="168"] West
Read More...

So far so good

January 6, 2015
Progress has continued at a reasonable to even a good pace. Saturday saw the balance of the garage south wall and most of the west wall ICF modules placed. Ted had come by in the afternoon which was fortuitous as it led to a conversation about door ope
Read More...

Reboot Complete!

January 2, 2015
I am pleased to advise that I have ended 2014 and started 2015 with progress. On the 29th Ted dropped by for the morning and we worked on rechecking all of the previously laid out ICF modules for both elevation and alignment. I was pleased that only
Read More...