The End does not always justify the effort getting there.

As I wrote in my last post, I had some significant problems with the pour of the exterior basement walk-up foundation. When a corner of the forms busted open during the pour, I lost a healthy 1/3 cubic meter before … Continue reading

Posted in Project Journal | Tagged , , , , , , , | Leave a comment

A poor pour! – But it is complete.

Well, I am glad that is over.  This concrete pour turned out to be the one that tried to get away.  I should have know something was up when the Municipal inspector raised concerns last Friday, that it was not … Continue reading

Posted in Project Journal | Tagged , , , | 2 Comments

Time to Pour – Concrete is coming.

Well, I am pleased to say that I actually exceeded my schedule and will be ready to pour my architectural concrete wall on Tuesday, a full week sooner than I planned.  This either means I am getting faster or that … Continue reading

Posted in Project Journal | Tagged , , , , , , | Leave a comment

Forms Away! – Pulled the trigger on the foundation forming design.

Just a quick update tonight as not a lot has physically happened at site this week beyond doing wood moisture checks and humidifier maintenance. A de-humidifier I bought online from Costco arrived today and based on initial testing (4 hours), … Continue reading