The End does not always justify the effort getting there.

As I wrote in my last post, I had some significant problems with the pour of the exterior basement walk-up foundation. When a corner of the forms busted open during the pour, I lost a healthy 1/3 cubic meter before … Continue reading

Posted in Project Journal | Tagged , , , , , , , | Leave a comment

Lost Track

The last week has progressed well.  It has been reasonably dry and I was able to get a lot of the backfill complete.  The back west wall is almost complete (put it aside to do other weather dependent things).  Mr. … Continue reading

Posted in Project Journal | Tagged , , , , , , , , | Leave a comment

In the name of Science

Well. I am extremely grateful I moved Alfie to the back yard last Friday as by Saturday AM, about 4ft of the back-filled south bank had caved in.  If Alfie was still on the front bank, I would have had … Continue reading

Posted in Project Journal | Tagged , , , , , , , , | 2 Comments

Coming out of the hole.

Sorry folks – I know it has been a while since the last update.  To be frank, I have been in a funk and have had a lot on my plate!  Lets bring you up to speed. On July 28th … Continue reading

Posted in Project Journal | Tagged , , , , , , , , , , , , , | 2 Comments

Drained

The last week has proceeded well and of this afternoon I have finished installing a perimeter drain field.  All runs have been routed and tied into the deep pump-up sump.  I was lucky, about 40% of the pipe was above … Continue reading

Posted in Project Journal | Tagged , , , , , , , , , , , , , | Leave a comment